
Reduction of material losses in quarry
15 December 2022
Build-ups in the preheating tower
4 January 2023Italian factory for processing steel waste
PROBLEM:
Bridging and rat holing clogging on a double-extraction steel hopper
OBJECTIVE:
Eliminate all risks of extraction blockages.

SOLUTION:
Installation of 4 AIRCHOC® Wireless ACW510SD air blasters.
RESULT:
No more shutdowns of production due to clogging of extractions. Safe, user friendly solution with the Wireless: the operator can activate manual blasts with the remote control or from the control room.